MIL-DTL-45195F (AR)
Conformance inspection by classification of characteristics
PARAGRAPH
TITLE
DRAWING NUMBER
SHEET 1 OF 1
4.3.2.3
Projectile loading assembly (prior to assembly
9211610
of liner)
NEXT HIGHER
ASSEMBLY
9211611
CLASSIFICAT
EXAMINATION OR TEST
CONFORMANCE
REQUIREMENT
INSPECTION
ION
CRITERIA
PARAGRAPH
METHOD
REFERENCE
Critical
1
Base separation, destructive test
4.4.1
3.8
4.4.1.1
see(6.16.9)
Major
101
Fuze well surface cavitation
Level IV
3.7
Visual/
excessive
Dedicated
Illumination(D
I)
102
Loose explosive in fuze well
Level
IV
3.9
Visual/DI
103
Foreign material in fuze well
Level
IV
3.9
Visual/DI
104
Depth of fuze well.
Level
IV
3.2.3
AIE
105
Diameter of fuze well max.
Level
IV
3.2.3
AIE
106
Projectile threads not clean prior to
Level
IV
3.2.3
Visual/DI
application of adhesive
107
Caked explosive on mating surfaces of
100%
3.6
AIE
threads
108
Application of adhesive incomplete or
Level IV
3.2.3
Visual
incorrect
Minor
201
Evidence of poor workmanship
Level II
3.13
Visual
21
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business