MIL-DTL-45195F (AR)
Conformance inspection by classification of characteristics
DRAWING NUMBER
PARAGRAPH
TITLE
SHEET 2 OF 3
9211610
4.3.2.2
Projectile loading assembly (Before post
cycle heating)
NEXT HIGHER
(Radiographic acceptance requirements)
ASSEMBLY
9211611
CLASSIFICATI
EXAMINATION OR TEST
CONFORMANCE
REQUIREMENT
INSPECTION
ON
CRITERIA
PARAGRAPH
METHOD
REFERENCE
Critical
6
Cast defects in Segment B, except
100%
3.5.4
4.4.3
for porosity in excess of twice the
through
requirements of Table I (see 6.16.6)
3.5.8
7
Metal parts defects, except rotating
100%
3.5.1
4.4.3
band gaps, in excess of that
permitted (see 6.11 and 6.16.7)
8
Foreign material in the explosive
100%
3.5.2
4.4.3
cast (see 6.16.8)
19
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business