MIL-DTL-45195F (AR)
TABLE III First article inspection
Number of
REQUIREMENT
INSPECTION
FAT Samples
PARAGRAPH
METHOD
REFERENCE
Projectile loading assembly (dwg 9211610)
Examination for defects, Note 1
10
3.2
4.3.2.1-4.3.2.5
Base separation test
10
3.8
4.4.1
Cartridge, 105mm, HE, M1
Loading, Assembly and Marking
(Dwg 9211611)
Examination for defects, Note 1
30
3.2
4.3.2.6-
4.3.2.13
Ballistic test (Safety)
25
3.12
4.4.2.2
Ballistic test (Muzzle velocity)
15
3.12
4.4.2.1
Note 1. The examination for defects in paragraph 4.3.2 are for dimensional and visual
inspections and in many cases must be verified during assembly.
15
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business