MIL-DTL-45195F (AR)
4.
VERIFICATION
TABLE II. Requirement/verification cross reference matrix
Methods of Verification
Classes of Verification
N/A Not Applicable
A- First Article
1 Analysis
B- Acceptance
2 Demonstration
3 Examination
4 - Test
Section 3
Description
Verification
Verification
Section 4
Requiremen
Method
Class
Verification
ts
N/
1234
A
B
A
3.1.1
First article
XX
X
4.2
3.1.2
Conformance
XX
X
4.3
3.2.1
Projectile loading
XX
X
X
4.3.2.1
assembly (prior to
loading explosive)
3.2.2
Projectile loading
XX
X
X
4.3.2.2
assembly (Before
post cycle
heating)(Radiograph
ic acceptance
requirements)
3.2.3
Projectile loading
XX
X
X
4.3.2.3
assembly (prior to
assembly of liner)
3.2.4
Projectile, 105MM,
XX
X
X
4.3.2.4
HE, M1 LAP (prior
to assembly of
supplementary
charge, if
applicable)
3.2.5
Projectile 105MM,
XX
X
X
4.3.2.5
HE, M1 LAP (prior
to assembly of
closing plug)
3.2.6
Primer (Prior to
XX
X
X
4.3.2.6
assembly to case)
Cartridge case
XX
X
X
4.3.2.7
3.2.7
(prior to
assembling
propelling charge)
Propelling charge
XX
X
X
4.3.2.8
3.2.8
(prior to assembly
into cartridge
case)
TABLE II. Requirement/Verification Cross Reference Matrix- Continued
12
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business