MIL-DTL-48360A (AR)
4. VERIFICATION
TABLE I. Requirement/verification cross reference matrix.
METHOD OF VERIFICATION
CLASSES OF VERIFICATION
1 Analysis
A First article
2 Demonstration
B - Conformance
3 Examination
4 Test
Section 3
Description
Verification
Verification
Section 4
Requirement
Methods
Class
Verification
1
2
3
4
A
B
3.1.1
First article inspection
X
X
X
4.2
3.1.2
Conformance inspection
X
X
X
4.3
3.2.1
Body
X
X
X
X
4.3.2.1, 4.4.1
3.2.2
Cloth, Lead, Laminated
X
X
X
X
4.3.2.2
3.2.3
Body and liner assembly
X
X
X
X
4.3.2.3
3.2.4
Charge, propelling, M200
X
X
X
X
4.3.2.4
assembly
3.3
Propellant weight
X
X
X
X
4.3.3.1-4.3.3.2,
4.4.2
3.4
Proving ground
X
X
X
X
4.3.3.2, 4.4.3
3.4.1
PIMP pressure (+145°F)
X
X
X
X
4.4.3.2.1
3.4.2
Average pressure (+145°F)
X
X
X
X
4.3.3.2.1
3.4.3
Average pressure (+70°F)
X
X
X
X
4.3.3.2.1.1
3.4.4
Muzzle velocity
X
X
X
X
4.3.3.2.2
3.5
Tolerance
X
X
X
X
4.4.3
3.6
Marking
X
X
X
X
4.5
3.7
Workmanship
X
X
X
X
4.3.2.1-4.3.2.4
3.8
Fiber drum
X
X
X
X
4.3.2.5-4.3.2.8
4.6
4.1 Classification of inspections. The verification requirements specified herein are
classified as follows:
a.
First article inspection (see 4.2).
b.
Conformance inspection (see 4.3).
4.2 First article.
4.2.1 First article quantity. First article verification shall be performed on the quantity of
items as indicated in Table II and when required Table III (see 6.10).
4.2.2 Inspection to be performed. The first article inspection shall consist of 100%
examination for defects of all drawing requirements including workmanship requirements for the
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business