MIL-DTL-48360A (AR)
test data should be forwarded to: Commander, ARDEC, Attn: RDAR-QEM-A and one copy to
Attn: RDAR-MEE-W, Dover, NJ 07801.
6.9 Drawings. Drawings listed in Section 2 of this specification under the heading U.S.
Army Armament Research and Development Command (ARDEC) may also include drawings
prepared by and identified as, Edgewood Arsenal, Frankford Arsenal, Rock Island Arsenal or
Picatinny Arsenal drawings. Technical data originally prepared by these activities is now under
the cognizance of ARDEC.
6.10 Initial production test. The initial production test is a onetime qualification test for a
new contractor to load, assemble and pack acceptable M200 propelling charges. Once a
contractor has demonstrated the ability to load, assemble and pack the propelling charges, the
initial production test may be waived by the contracting officer. The following test program
should be used for the initial production test:
TABLE IV. Initial production test.
Test Phase
Temperature
No. Control
No. Test
TECOM
(Deg F)
Rounds
Rounds
TOP
Propellant
70
10
TOP-4-2-504
checkout
145
10
TOP-4-2-504
-60
10
TOP-4-2-504
Sequential
145
15
60
TOP-4-2-504
Environmental
-60
15
60
TOP-4-2-504
6.11 Subject term (key word) listing.
Lead Foil
Lead Laminate Cloth
M200
6.12 Changes from previous issue. Marginal notations are not used in this revision to identify
changes with respect to the previous issue due to the extent of the changes.
Custodian:
Preparing activity:
Army-AR
Army-AR
(Project Number: 1315-2014-004)
NOTE: The activities listed above were interested in this document as of the date of this
document. Since organizations and responsibilities can change, you should verify the currency of
the information above using the ASSIST Online database at https://assist.dla.mil.
18
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business