MIL-DTL-48360A (AR)
Drawing Number
9282042
4.3.2.4
Charge, propelling M200 loading assembly.
Next Higher
Assembly
N/A
Conformance
Requirement
Inspection Method
Classification
Examination or Test
Criteria
Paragraph
Reference
Critical
1
Pressure exceeds PIMP at 145 degrees F
4.3.3.2
3.4.1
4.4.3.2.1
2
Minimum propellant weight
100%
3.3.1
4.4.2.1
AAIE 2/
3
Visual
Assembly damaged to the extent that
100%
3.2.4
propellant can escape
Major
101
Weight of propellant
100%
3.3
Scale/4.4.2/
4.3.3.1
102
Any seam or opening incompletely stitched
Level IV
3.2.4
Visual
103
Thread broken
Level IV
3.2.4
Visual
104
Muzzle velocity and muzzle velocity
4.3.3.2
3.4.4
4.4.3.2.2
standard deviation
105
Excessive thread used in tacking operation
100%
3.2.4
Visual/Manual
Minor
Level II
201
Evidence of poor workmanship, 1/
3.7
Visual
1/ Some delamination and tearing of lead foil is expected during loading and is not a cause for rejection.
2/ Automated Acceptance Inspection Equipment shall be in accordance with MIL-A-70625
10
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business