MIL-DTL-14852D (AR)
Conformance inspection by classification of characteristics
DRAWING NUMBER
PARAGRAPH
TITLE
Projectile, 105MM, M314A3 and M1064 metal parts
SHEET 1 OF 1
10534900
4.3.2.7
assembly destructive lot acceptance
NEXT HIGHER
ASSEMBLY
--
CONFORMANCE
REQUIREMENT
INSPECTION METHOD
CLASSIFICATION
EXAMINATION OR TEST
CRITERIA
PARAGRAPH
REFERENCE
Critical
1
Ballistic test failure(excess
4.4.6
3.6.1
4.4.6
pressure): projectile break-up or
component separation in-bore or in
flight
2
Ballistic test failure (excess
4.4.6
3.6.2
4.4.6
pressure): rotating band failure
Major
101
Ballistic test failure (excess
4.4.6
3.6.3
4.4.6
pressure): shearing of rotating band
Minor
None defined
23
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business