MIL-DTL-60315C (AR)
4.2.2.1 Rejection. The first article sample shall be rejected if the sample fails to meet
any of the requirements.
4.3 Conformance Inspection.
4.3.1 Inspection lot formation. Inspection lots shall comply with the lot formation
provision of MIL-DTL-1916 specification. Lot numbering, as required, shall be in accordance
with MIL-STD-1168. Each inspection lot of loaded charge assemblies shall contain:
a. Single perforated propellant from not more than one lot.
b. Multi perforated propellant from not more than one lot. An entire lot of multi-
perforated propellant shall be utilized in the formation of one lot of propelling charges unless
otherwise specified.
4.3.2 Classification of characteristics.
a. Sampling requirements. Inspection sampling requirements for critical, major and
minor characteristics are defined in MIL-STD-1916. Unless specified otherwise, Inspection
Level IV shall be used for all characteristics defined as Majors and Inspection Level II for all
Minor characteristics; Critical characteristics shall be addressed in accordance with MIL-STD-
1916.
b. Conformance inspection. Conformance inspection shall be performed in
accordance with Paragraphs 4.3.2.1 to 4.3.2.6.
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business