MIL-DTL-70526B (AR)
US ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING
CENTER (ARDEC) DRAWINGS
12926809 - Delay Assembly
13023959 - Radiographic Inspection Method for Artillery
Projectiles and Components
(Copies of these drawings may be requested online at
Drawing.Request@conus.army.mil or from U.S. Army ARDEC, ATTN:
RDAR-AIS-TD, Picatinny, NJ 07806-5000.)
2.3 Non-Government publications. The following documents
form a part of this document to the extent specified herein.
Unless otherwise specified, the issues of these documents are
those cited in the solicitation or contract.
ASTM INTERNATIONAL (ASTM)
ASTM B430 - Standard Test Method for Particle Size
Distribution of Refractory Metal
Powders and Related Compounds by
Turbidimetry
(Copies of ASTM standards are available online at
https://www.astm.org or from American Society for Testing and
Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-
2959)
2.4 Order of precedence. Unless otherwise noted herein or
in the contract, in the event of a conflict between the text of
this document and the references cited herein, the text of this
document takes precedence. Nothing in this document, however,
supersedes applicable laws and regulations unless a specific
exemption has been obtained.
3.
REQUIREMENTS
3.1 Required inspections.
3.1.1 First article. When specified (see 6.2), a sample
shall be subjected to first article inspection in accordance with
4.2.
3.1.2 Conformance. A sample shall be subjected to
conformance inspection in accordance with 4.3.
3.2 Components and assemblies. The components and
assemblies shall comply with all requirements specified on
drawing (dwg.) 12926809.
3
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business