MIL-DTL-20354D (AR)
6.13 Automatic gaging. Facilities equipped with Government
furnished automatic gaging capable of performing 100 percent
inspection of any characteristic should utilize capability
in accordance with contract.
6.14 Process control dimensions. The contractor should
prepare a process control plan for the dimensions marked
process control. The plan should be submitted to the
technical agency for approval prior to use. Dimensions to be
gaged for process control are to be assured to a level IV.
6.15 Inspection equipment. For inspection equipment required
to perform the examinations and tests prescribed herein the
contractor should submit for approval inspection equipment
designs in accordance with the terms of the contract. See
paragraph 6.3 herein.
6.16 Automatic inspection equipment. All automatic test and
inspection equipment when utilized by the contractor should
be subjected to periodic verification or calibration checks
during production. The procedures should include as a
minimum: frequency, method of verification/calibration.
These procedures should be included in the
operation/calibration procedures as required by the above
paragraph.
6.17 Critical classification notes.
6.17.1 Primer above flush. A primer above flush may result
in unintended initiation of the primer causing the cartridge
to function in the bore of the weapon, likely resulting in
death or serious injury to the troops.
6.17.2 Projectile safety. Any premature function or metal
parts separation in bore of the gun or in flight is likely
to cause injury or death to troops firing the howitzer.
6.18 Definitions.
Acceptance Inspection Equipment (AIE). Any measuring
device that is traceable to the national or
international standard used to assure conformance of
material to the contract requirements.
6.19 Changes from previous issue. Asterisks are not used in
this revision to identify changes with respect to the
previous issue due to the extensiveness of the changes
6.20 Subject term (keyword) listing.
Ammunition
Artillery
Illuminating
Military Specification
42